MANUFACTURING · 06

Project Delivery

S02 · INPUT

Confirm project conditions before organizing delivery

Delivery is not a single shipment action; it combines project boundaries, manufacturing status and site timing.

Project boundary

Confirm project area, system scope, batches and owners.

Technical inputs

Check drawing version, configuration, finish and packaging requirements.

Site timing

Coordinate material preparation, shipment and receiving windows.

Evidence needs

Agree how batch, inspection, handover and exception records will be kept.

S03 · DELIVERY UNIT

Connect project, system and package through delivery units

This relationship map is a field-structure example; it does not claim ERP, MES, QMS or QR deployment.

01

Project

Project ID · area · delivery window

02

Area

Roof / ground · zone · batch

03

System

Structure · module set · version

04

Package

Carton / pallet · label · quantity check

Field exampleThis relationship map is a field-structure example; it does not claim ERP, MES, QMS or QR deployment.

S04 · HANDOVER

Packaging and handover should leave usable site evidence

Align information first, then arrange handover. Quantities, owners and dates follow the confirmed project sheet.

  1. A

    Freeze configuration

    Use the confirmed version as the material and production input.

  2. B

    Mark batches

    Keep packaging, loading and area lists in one batch language.

  3. C

    Check arrival

    Check cartons, appearance and shortages against the list.

  4. D

    Record handover

    Keep receipt, exception and follow-up records.

Example delivery objects and evidence fields
Delivery objectFields to confirmSuggested evidence
Structures and connectorsSpecification / quantity / versionPacking list + batch label
Area package unitArea / carton or pallet / windowHandover sheet + exception photos
Project document packDrawings / inspection / change logProject folder + version record

S05 · EVIDENCE

Make delivery status clear, and make the boundary clear

The content establishes a shared checking language; it does not present example fields as deployed enterprise capabilities.

E1

Configuration evidence

Confirmation sheet, drawing version and change log.

E2

Quality evidence

Inspection record, batch information and exception closure.

E3

Handover evidence

Packing list, receipt record and site feedback.

This example page does not claim project counts, system integration, certifications or real-time production status; delivery capability is confirmed through project materials and enterprise verification.

S06 · NEXT STEP

Start the project team from one shared delivery brief

Share the project area, product scope, batches and delivery window so the engineering team can confirm the route.