Confirm project area, system scope, batches and owners.
S02 · INPUT
Confirm project conditions before organizing delivery
Delivery is not a single shipment action; it combines project boundaries, manufacturing status and site timing.
Check drawing version, configuration, finish and packaging requirements.
Coordinate material preparation, shipment and receiving windows.
Agree how batch, inspection, handover and exception records will be kept.
S03 · DELIVERY UNIT
Connect project, system and package through delivery units
This relationship map is a field-structure example; it does not claim ERP, MES, QMS or QR deployment.
Project
Project ID · area · delivery window
Area
Roof / ground · zone · batch
System
Structure · module set · version
Package
Carton / pallet · label · quantity check
Field exampleThis relationship map is a field-structure example; it does not claim ERP, MES, QMS or QR deployment.
S04 · HANDOVER
Packaging and handover should leave usable site evidence
Align information first, then arrange handover. Quantities, owners and dates follow the confirmed project sheet.
- A
Freeze configuration
Use the confirmed version as the material and production input.
- B
Mark batches
Keep packaging, loading and area lists in one batch language.
- C
Check arrival
Check cartons, appearance and shortages against the list.
- D
Record handover
Keep receipt, exception and follow-up records.
| Delivery object | Fields to confirm | Suggested evidence |
|---|---|---|
| Structures and connectors | Specification / quantity / version | Packing list + batch label |
| Area package unit | Area / carton or pallet / window | Handover sheet + exception photos |
| Project document pack | Drawings / inspection / change log | Project folder + version record |
S05 · EVIDENCE
Make delivery status clear, and make the boundary clear
The content establishes a shared checking language; it does not present example fields as deployed enterprise capabilities.
Configuration evidence
Confirmation sheet, drawing version and change log.
Quality evidence
Inspection record, batch information and exception closure.
Handover evidence
Packing list, receipt record and site feedback.
This example page does not claim project counts, system integration, certifications or real-time production status; delivery capability is confirmed through project materials and enterprise verification.
S06 · NEXT STEP
Start the project team from one shared delivery brief
Share the project area, product scope, batches and delivery window so the engineering team can confirm the route.